山东山汽工程机械(集团)有限公司
热线电话:400-879-1999 山汽微信
郑重声明 购机 售后
在线询价
热线电话:400-879-1999
您现在所在的位置: 首页> 新闻资讯 > 行业新闻

全自动上料搅拌车传动油质量检测应该注意什么?

所属分类:行业新闻 发布时间:2020-11-26 来源:http://www.shanqijituan.com 浏览量:0

在设备的实际操作期间,自上料搅拌车的转移也是非常重要的组成部分。因此,我们需要在使用过程中测试机油的质量。那么我们如何具体运作?
During the actual operation of the equipment, the transfer from the loading mixer is also a very important part. Therefore, we need to test the quality of the oil in use. So how do we operate?
1.将自上料搅拌车停在水平表面上并拧紧手刹。
1. Park the self loading mixer on the horizontal surface and tighten the handbrake.
2.让发动机怠速运转几分钟。
2. Let the engine idle for a few minutes.
3.踩下制动踏板,将操纵杆转倒档,前进档等,并在每个档上停留几秒钟,以向变矩器和所有换档执行器注满液压油。后,将操纵杆转到停车位置。
3. Step on the brake pedal, turn the control lever to reverse gear, forward gear, etc., and stay at each gear for several seconds to fill the torque converter and all shift actuators with hydraulic oil. After that, turn the lever to the park position.
4.从加油管上取下自动变速箱油尺,将清洁过的油尺插入加油管,然后将其拉出以检查油尺上的油位。
4. Remove the automatic transmission dipstick from the oil filler tube, insert the cleaned dipstick into the filler tube, and then pull it out to check the oil level on the dipstick.
在检查自上料搅拌车或对其进行故障排除之前,请先检查变速箱油位和油质。将变速杆置于P位置,在空转时运转发动机少几分钟,油液达到正常的工作温度,并且车辆必须停放在水平表面上,以确保差速器和油门之间的油位。传输通常是稳定的。
全自动上料搅拌车
Please check the gearbox oil level and oil quality before checking or troubleshooting the self loading mixer. With the shift lever in position P, run the engine at idle for at least a few minutes, the fluid reaches normal operating temperature, and the vehicle must be parked on a horizontal surface to ensure the oil level between the differential and the throttle. Transmission is usually stable.
卸载自上料搅拌车时的注意事项
Precautions for unloading from loading mixer
自上料搅拌车在某些建筑过程中是常见的机械车辆设备,并且在操作设备的过程中有某些预防措施。因此,让我们看一下当今卸料过程中自上料搅拌车的注意事项。
Self loading mixer is a common mechanical vehicle equipment in some construction process, and there are some preventive measures in the process of operating the equipment. Therefore, let's take a look at the matters needing attention of the self loading mixer in the unloading process.
1.卸货前,让混合罐全速运转一到两分钟,使混凝土搅拌均匀。如有必要,加一些水使混凝土均匀混合并易于卸料。
1. Before unloading, let the mixing tank run at full speed for one to two minutes to make the concrete mix evenly. If necessary, add some water to make the concrete evenly mixed and easy to unload.
2.物料后,将汽车尽可能停放在地面上,然后弄湿料斗斜槽以方便清洁。
2. After removing materials, park the car on the ground as much as possible, and then wet the hopper chute to facilitate cleaning.
3.好在安装时看一下物料,以免操作卸料杆。倒退中间位置时好停止燃油箱,以保护减速器,支撑轮等。
3. It is good to check the materials during installation to avoid operating the unloading rod. When reversing the middle position, stop the fuel tank to protect the reducer, support wheel, etc.
4.洗瓶时必须仔细清洗,并将水反复倒转两次,然后松开,后一次将水倒入水箱中放入水箱中,然后返回工位并加水彻底清洗水箱。
4. The bottle must be cleaned carefully, and the water should be turned back twice repeatedly, and then released. After that, the water will be poured into the water tank and put into the water tank. Then, return to the working position and add water to clean the water tank thoroughly.
为了确保自上料搅拌车运行期间设备的良好运行性能,我们希望您必须了解这些注意事项。由于对设备的了解不足,因此在操作过程中避免了操作错误,这会影响正常施工过程的进度。
In order to ensure the good operation performance of the equipment during the operation of the charging mixer, we hope you must understand these precautions. Due to the lack of understanding of the equipment, operation errors are avoided in the operation process, which will affect the progress of normal construction process.

 

首页 产品 电话 置顶